CONNECT WITH US

Tech

Looksmaxxing my bedroom TV with the Hisense Déco: The chic, small, budget QLED TV that blends in with my decor

Published on

Looksmaxxing my bedroom TV with the Hisense Déco: The chic, small, budget QLED TV that blends in with my decor


A Mashable Choice Award is a badge of honor, reserved for the absolute best stuff we’ve tested and loved.

Table of Contents

As a society, we're down to spend money on a nice new living room TV every so often. But smaller spaces like the kitchen or a bedroom seem to have been dubbed undeserving of a TV upgrade — even if the current TV is crappy, or even if we spend a lot of time in that room. To be fair, there weren't many exciting options to choose from. I don't know how the stylish budget-friendly small TV market went so untapped for so long, but Hisense was genius for throwing the S5 Déco QLED TV into the mix.

What's special about the Hisense Déco TV

Available in 32 or 43 inches, the Hisense Déco TV is a purposefully small QLED TV with a chic white "art-inspired design." That's not to be confused with matte art TVs that lie flat against the wall like framed art. So while the Hisense Déco isn't a direct dupe for The Frame or the Hisense CanvasTV, it still speaks to the style-conscious part of your brain that cares about the cohesiveness of a space. Why settle for a blatantly techy TV if your bedroom's decor calls for something more whimsical?

The case for an aesthetically pleasing bedroom TV

I've been carefully curating my bedroom's ambiance for years, as most of us do. There are few places more comforting than the personal cave we've designed for ourselves, few activities that sound better than watching something cozy in bed. It simply makes sense for the TV to mesh with the rest of your decor.

Cat watching "Sex and the City" on Hisense Déco TV
The Hisense Déco TV matches my room's color scheme and level of whimsy. Credit: Leah Stodart / Mashable

Outside of expensive art TVs with swappable frames, I don't think I had ever seen a TV that strays from the standard black design. Apparently, neither had all of the people who flooded my DMs when I posted the above photo on my Instagram Story.

"What is this?!", "I've literally never seen a white TV before omg", "I'm scared to know how much this costs but I need it", and "This pic is literally so chic omg" were just a few of the replies. You get the point: There was clearly a need for a classy little decor-centric TV that doesn't cost $600, like the smallest Frame TV.

Hisense Déco TV's curved edges and Fire TV streaming apps on screen
The display flows right into the central stand, so you don't need to screw on legs. Credit: Leah Stodart / Mashable
Hisense Déco TV remote laying on dresser near TV
The remote is your average Fire TV remote. Credit: Leah Stodart / Mashable

My current dresser was my mom's when she was a teenager in the '70s. It's an eggshell color with swirly gold handles, topped with various trinkets like antique jewelry boxes, perfume, a skeleton hand from Michaels' Halloween section that I use as a ring holder... the classics. I always thought that the arrangement was way too elegant for the old black plasticky TV that also lived there. (The mismatch would probably be less obvious if I mounted the TV on the wall instead, but I ain't doing all that.) The 32-inch Hisense Déco is the seamless addition that I had unknowingly been waiting for.

Instead of standing on two stubby legs, the Déco's curved white bezels flow directly into the base of the TV. The sculptural one-piece build feels avant-garde for TV standards, but also means that no assembly is required.

Picture quality is actually quite sharp for non-4K

The Hisense Déco's screen has some serious pop, especially compared to a dull LED screen. The Déco's full HD resolution isn't as granular as the 4K you'll see on 90 percent of TVs, but I don't think the average $200 32-inch TV buyer will be that picky about upscaling. Shadows aren't pixelated like they were on my old TV, and there's no overall fuzziness. I was thoroughly impressed by the sharpness of subtitles, despite the letters being so small.

Hisense Déco TV sitting on dresser while playing a scene from "Our Planet"
A coral reef wouldn't be nearly this colorful on my old TV. Credit: Leah Stodart / Mashable

The layer of quantum dots picks up a lot of the slack from the lack of 4K. While LED vs. QLED and FHD vs. 4K are talking about two different TV specs (light and resolution, respectively), the range of a QLED TV's color palette does create a crispier image than an LED TV. These tiny nanocrystals can emit over a billion different colors, deepening black levels and brightening light tones to create a more contrasted picture. The colors on the Hisense Déco are legitimately stunning. They were even rich enough to hold their own against the color-changing bulbs in my nightstand, which are the only lights on in my room at night.

I struggle to wind down at night as it is, so I typically don't watch anything that I actually need to pay attention to before bed. If I absolutely need some background noise, Planet Earth or Our Planet for the 40th time it is. The Déco really did the habitats on these shows justice. Between spot-on color accuracy and vibrant hues across the board, it's quite the immersive experience for such a little TV.

Bright objects in dark scenes do sometimes have a glow around them. The Déco's screen uses a direct backlight rather than full-array local dimming, so it doesn't benefit from little clusters of bulbs that turn off to reduce the halo effect. But the casual watcher probably won't even notice — a TV this small isn't meant to have the picture quality of an advanced home theater TV.

Hisense Déco TV sitting on dresser while playing a scene from "Rosario"
I hate when movies show the demon. Anyway, the dark scenes in "Rosario" looked awesome. Credit: Leah Stodart / Mashable
Hisense Déco TV sitting on dresser while playing a scene from "Paranormal Activity 3"
The Déco didn't muddy the overnight recordings from "Paranormal Activity 3" at all. Credit: Leah Stodart / Mashable

The occasional blooming didn't affect my weekend horror movie watching, at least. In my time with the Déco TV so far, I crossed Hallow Road and Rosario off my list and threw in a comfort rewatch of Paranormal Activity 3. Dark scene details in all three films were less gray and significantly more legible from a few feet away in my bed than on my old TV.

If you haven't switched to a smart TV yet, do it

Many small space TVs are such an afterthought that they haven't made it out of the dumb TV phase yet. That was me using my bedroom TV from high school at age 30. The ol' Fire Stick rig can make it possible to access streaming apps on a regular TV for several years. But as I learned, a TV can simply get so old that it can't handle an external streaming device anymore.

A single arrow click on the Fire TV remote was enough to send my old TV into shock. It was so frustrating that I stopped bothering trying to watch anything at all. So not only was that TV an ugly plastic box that didn't match my room at all, but it was doing nothing but collecting dust.

After a month or so with the Hisense Déco, I can't believe I put up with a non-smart TV setup for so long. The Déco's Fire TV interface is highly responsive and as easy to navigate as Fire TV always is. You mean I can just click on a streaming app and it plays the content? Without the possibility of spontaneous combustion?

Is it a reach to classify a reliable bedroom TV as a productivity hack? That's one surefire way to pair some universally-hated chores — like folding laundry or cursing out the fitted sheet while you make your bed — with an activity you enjoy, like catching up on a show. It's also nice to not be relegated to the living room couch if I want to watch something live. Now, I can throw the new episode of Abbott Elementary or an NBA game on in my room without propping my phone up to watch YouTube TV. (That app would have sent my old TV into orbit.)

Factors to keep in mind

The Hisense Déco TV is the rare QLED TV that isn't 4K. The difference between the Déco's FHD resolution (1920 x 1080 pixels) and 4K (3840 x 2160 pixels) would be most noticeable when intently watching a dark film in a dark room or playing video games. But no one would realistically be shopping for the decor-focused Déco TV with expectations for an elevated streaming or gaming experience.

Hisense Déco TV sitting on dresser while playing a scene from "The Office"
The reflection of my makeup desk in the top left corner was getting distracting. Credit: Leah Stodart / Mashable

QLED TVs are naturally brighter and easier to see in sunlit rooms than LED TVs. That doesn't automatically make them immune to glare in a bright room. The Déco TV definitely struggles to neutralize reflections when watching TV during the day. Because it's designed for such casual use, I'm not that pressed about the lack of glare reduction — plus, there are significantly more expensive QLED TVs that struggle just as much in lit rooms.

The competition

For those in the market for a small budget TV, it makes the most sense to compare the Déco TV to other TVs in its price range. Barring any extra wild discounts that could pop up during an event like Prime Day, a hard $200 cutoff will typically have you looking at 32- through 50-inch 4K LED TVs.

Best Buy often has the TCL 40-inch Q35F QLED FHD Fire TV on sale for $149.99 or the 50-inch Q5 QLED 4K Fire TV on sale for $179.99. Both are obviously larger screens for a little bit less money, but both are the exact plasticky black box design that we were trying to get away from. Hisense can't just make the prettiest small TV you've ever seen and then make it the same price as a boring small TV, you know?

Is the Hisense Déco TV worth it?

I'd recommend the Hisense Déco TV to anyone looking for a small space TV. You really couldn't ask for a more seamless TV setup: It's bright and responsive when you are watching it, stylishly camouflaged when it's off, and either size costs several hundred dollars less than The Frame of the same size.

I've been firmly on the living room side of the "bedroom person vs. living room person" conversation forever. Now, I'm convinced that some of my living room tendencies stemmed from the fact that my old bedroom TV sucked. The switch to the Hisense Déco has genuinely been such a delight, and I find myself carving out time to hang out in there instead. It's bright and bold enough for the full range of my TV watching needs, but more importantly, the satisfaction of its cohesiveness with the rest of the room never gets old.

With the world as overwhelming as it is, the safe space that is your bedroom deserves a little extra adornment. In this case, that adornment is a TV that serves c*nt.

How we tested

At the initial time of writing, the 32-inch version of the Hisense S5 Déco TV had been my bedroom TV for a month and a half. It replaced a dying 2010-ish non-smart LED TV that could no longer handle a Fire Stick. I watch the Déco TV several times per week, sometimes as background entertainment and sometimes to seriously watch a movie or a show. During the day, the Déco TV's screen is competing with heavy natural light from nearby windows. At night, the room is very dimly lit.

During testing, content watched on the Hisense S5 Déco TV ranged from casual TV shows like The Office and Sex and the City to a variety of horror movies with a lot of dark scenes, like Rosario and Paranormal Activity 3.

These were the main factors on my mind during testing:

  • Performance in bright and in dark rooms: Does the Hisense S5 Déco TV get bright enough for comfortable daytime viewing? Does its screen show reflections in natural lighting or from lamps? Does the Déco TV have the lighting precision necessary to make dark details and shadows pop while preventing blooming?

  • Smart TV platform: Is the Fire TV interface easy to navigate? Could someone new to the Fire TV platform easily get the hang of the app and settings layout? Does the TV respond quickly to the remote?

  • Price point: How to does the Hisense S5 Déco TV's performance compare to other budget TVs? Does the unique artsy design or QLED display make up for the fact that it's not 4K? Is $200 appropriate for a 32-inch TV?

Leah smiling in front of brick building
Leah Stodart
Senior Shopping Reporter

Leah Stodart is a Philadelphia-based Senior Shopping Reporter at Mashable where she covers and tests essential home tech like vacuums, TVs, beauty devices, and eco-friendly hacks. Her ever-evolving experience in these categories helps her make thoughtful recommendations for how to spend your money during shopping holidays like Black Friday, which Leah has been covering for Mashable since 2017.



Source link

Disclaimer

We strive to uphold the highest ethical standards in all of our reporting and coverage. We StartupNews.fyi want to be transparent with our readers about any potential conflicts of interest that may arise in our work. It's possible that some of the investors we feature may have connections to other businesses, including competitors or companies we write about. However, we want to assure our readers that this will not have any impact on the integrity or impartiality of our reporting. We are committed to delivering accurate, unbiased news and information to our audience, and we will continue to uphold our ethics and principles in all of our work. Thank you for your trust and support.

Google Preferred Source